L2M PROJECT

BAVIERA, S.A. – MAIN BUILDING, MADALENA

MADALENA, VILA NOVA DE GAIA, PORTUGAL

Mechanical plant design – 3.000m2 of intervention area.
Climatization System:
• Chiller heat pump, air-water, with 190kW of cooling power and 120kW of heating power
• 2-tube fan-coils (wall mounted and ducted models with high pressure);
• Ventilation and smoke control systems for parking floors;
• 4 air handling units with 21,000m3/h total airflow;
• Variable flow circulation pumps

View more projects

PORTUGAL

MADEIRA

Company

© 2024 L2m. All Rights Reserved