Mechanical engineering project
Renovation of HVAC technical area of the Hospital Center of the University of Coimbra (CHUC) with replacement of circulation pumps and their electrical panels.
The production of heated and chilled water is ensured by existing chillers and heat pumps installed in the thermal center, and it’s distributed by 16 hot water circuits and 12 of chilled water. This remodeling focus on renewal and replacement of existing circulation pumps in these circuits, using new devices with modern technology. The new units are equipped with VEV’s (electronic speed variators), optimizing the electrical power required to network increasing in the efficiency of the entire air conditioning system.