Remodeling and enlarging a nursing home, with the construction of a continuous care unit and also a kindergarten.
Design of mechanical, electromechanical and medical gases installations.
Chiller water-water heat pump (with dry-coolers) with 316kW of cooling power and 128kW heating power.
Three gas condensing murals with a total power of 216kW.
Air treatment units with a total air flow rate of 14,000 m3/h;
Centralized technical management system.