Mechanical installations project – HVAC. 

 

Definition of the intervention that covers the two basement floorsone ground flooran over-store floor and nine upper floors, in addition to the technical / roof floor 

Technical survey of the existing HVAC systembased on a four-pipe system with two chillers on the technical floor / roof and the hydraulic distribution network, whose main distribution plumbs are developed from the outsideat the back of the building.  

This project reflects 

  • Existing equipment that will be used 
  • And the changes inherent to the new architectureincluding repositioning of existing equipment and ducts, as well as the new air conditioning and ventilation equipment to consider 